BCNET PGTX Rack 1 Power Distribution Units Replacement on March 31, 2022 from 06:00 PT to 12:00 PT

From:       06:00 PT Thursday, March 31, 2022

To:         12:00 PT Thursday, March 31, 2022

 

Reason:     BCNET Network Team will be replacing the 120V and 208V End-of-Life Power Distribution Units in the Rack 1

at the BCNET Prince George Transit Exchange, PGTX.

 

 

Effects:    The following equipment in this rack has two or more physical power supplies and is expected to stay operational during this maintenance window:

  • UNBC PGTX-Edge1 (Master) Juniper EX4600 switch;
  • UNBC PGTX-Edge1 (Slave) Juniper EX4600 switch;
  • BCNET CR1.PGRG1 Core Router;
  • BCNET SRV1.PGRG1;
  • BCNET NDT.PGRG1;
  • BCNET CONSOLE1.PGRG1;
  • BCNET SW1.PGRG1;
  • BCNET PFS1.PGRG1.

 

The following equipment in this rack has only one physical power supply and will be powered down during this maintenance window for approximately 20 minutes:

  • Prince George Public Library Media Converter (affecting Prince George Public Library connection to BCNET CR1.PGRG1 Core Router);
  • BCNET CAPTURE1.PGRG1;
  • BCNET VPN DSL Modem;
  • BCNET US Robotics Modem;

 

 

Contact:    Please contact the BCNET Operations Center at 604-822-1348 option 3 or noc@bc.net

when network problems are experienced outside of a maintenance window.

 

Posted By:  BCNET Operations Center