BCNET VANTX old cabling removal in Harbour Centre Complex on January 14, 2021 07:00-16:00 PT

From:       07:00 PT Thursday, January 14, 2021

To:         16:00 PT Thursday, January 14, 2021

 

Reason:     Centre Electric Ltd. will be removing the following old BCNET cabling from conduits in Harbour Centre complex:

 

  • Copper 12 Cat5E cabling from 6B-Meet-Me-Room BCNET Rack 1 (R2.I) to BCNET Data Centre HC3225 Fiber BCNET Rack 3.
  • Copper 12 Cat5E cabling from BCNET Data Centre HC3225 BCNET Rack 3 to BCNET Comm Room HC1360 BCNET Rack 9.
  • 72 strand (3) Multimode cables from 6B-Meet-Me-Room BCNET Rack 1 (R2.I) to BCNET Data Centre HC3225 Fiber Rack 2.
  • 48 strand (1) Multimode cable from 6B-Meet-Me-Room BCNET Rack 2 (R2.J) to BCNET Comm. Room HC1360 BCNET Rack 9.

 

 

Effects:    No outage is expected, however it is a threatening activity because the fiber-optic cables with working services are located in the same conduits the removal work is being performed and any service terminated at the BCNET Vancouver Exchange, VANTX can potentially be affected.

 

Contact:    Please contact the BCNET Operations Center at 604-822-1348 option 3 or noc@bc.net

when network problems are experienced outside of a maintenance window.

 

Posted By:  BCNET Operations Center