UBC IT will be performing quarterly system maintenance on August 6, 2016 between 9:00 a.m and 17:00 p.m. Network upgrades will be performed on multiple building networks at UBC Vancouver campus.
Updates on our progress during System Maintenance will be available on our Service Bulletins site at www.it.ubc.ca/bulletins, or by contacting IT Service Centre at 604.822.6141 or via email at ubcuit-g-ops5@mail.ubc.ca.
Outage Plan | Impact Status | Activity Time |
---|---|---|
UBC Building Network Maintenance UBC Vancouver campus |
The following buildings on UBCV campus will experience loss of network connectivity for up to 15 minutes. DENT01 David Strangway (new Dentistry) Building The migration process for each building will last approximately 1 hour during which there will be a 15-minute outage to the building being worked on. All services relying on network connectivity in the building will be unavailable including VOIP phones, wireless, Internet, classroom, credit card payment, etc. |
9:00 a.m. – 17:00 p.m. |