BCNET Network Maintenance at VICTX on December 21, 2021 from 06:00 PT to 07:00 PT

From:       06:00 PT Tuesday, December 21, 2021

To:         07:00 PT Tuesday, December 21, 2021

 

Reason:     BCNET will need to rehome the existing Transit logical tunnels from the End-of-Life Juniper MPC3 card in slot 0 to other available cards in our Core Router at the BCNET Victoria Exchange, VICTX in preparation for this card replacement.

 

Effects:    This is a service affecting activity. The actual outage is expected to be less than 5 minutes within the Maintenance Window. The following services will be affected:

  • North Island College VR to Transit logical tunnel
  • Camosun College VR to Transit logical tunnel
  • Vancouver Island University VR to TX logical tunnel
  • VENUS Shore Station at IOS (UVic) to TX logical tunnel
  • Vancouver Island Technology Park (UVic) to TX logical tunnel

 

 

Contact:    Please contact the BCNET Operations Center at 604-822-1348 option 3 or noc@bc.net

when network problems are experienced outside of a maintenance window.

 

Posted By:  BCNET Operations Center

604-822-1348 option 3 noc@bc.net