BCNET KELTX (KLWN1) Rack 2, Rack 3, Rack 4 and Rack 5 Power Distribution Units Replacement on October 15, 2021 06:00-20:00 PT

From:       06:00 PT Friday, October 15, 2021

To:         20:00 PT Friday, October 15, 2021

 

Reason:     BCNET will be replacing eight End-of-Life Power Distribution Units in the Rack 2, Rack 3, Rack 4 and Rack 5 at the BCNET Kelowna Exchange, KELTX (KLWN1).

 

 

Effects:    This activity is not expected to be service affecting. The following equipment in these racks has two or more physical power supplies and is expected to stay fully operational during this maintenance window:

 

  • CR1.KLWN1
  • SW1.KLWN1
  • CONSOLE1.KLWN1

–     WS1.KLWN1

–     KLWN1RLS1

–     SRV1.KLWN1

–     FPS1-BCNET.KLWN1

–     UBCO_PROCERA Equipment

–     SHAW_TRANSIT_ETX-220A

–     SHAW_CHIME_ETX-220A

–     SHAW_OC_ETX-220A

–     TELUS_TRANSIT_EX3400

 

Contact:    Please contact the BCNET Operations Center at 604-822-1348 option 3 or noc@bc.net

when network problems are experienced outside of a maintenance window.

 

Posted By:  BCNET Operations Center

604-822-1348 option 3 noc@bc.net