BCNET VANTX1 Rack 2 Power Distribution Units Replacement on December 17, 2020 06:00-08:00 PT

From:       06:00 PT Thursday, December 17, 2020

To:         08:00 PT Thursday, December 17, 2020

 

Reason:     BCNET will be replacing two End-of-Life Power Distribution Units in the Rack 2 at the BCNET Vancouver Exchange, VANTX1.

 

 

Effects:    The following equipment in this rack has two or more physical power supplies and is expected to stay operational during this maintenance window:

 

  • NET-DIRECTOR1.VNCV1
  • ASR 1 BCNET (UBC MedIT)
  • ASR 2 BCNET (UBC MedIT)

 

 

The following equipment in this rack has only one physical power supply and will be down during this maintenance window for approximately 30 minutes:

 

  • VNCV1
  • VNCV2
  • FWBCNET1A (UBC MedIT)
  • FWBCNET1B (UBC MedIT)
  • SAA2-MPAACT (UBC MedIT)
  • SW1-MPAACT.VNCV1 (UBC MedIT)
  • SW2-MPAACT.VNCV1 (UBC MedIT)

 

 

Contact:    Please contact the BCNET Operations Center at 604-822-1348 option 3 or noc@bc.net

when network problems are experienced outside of a maintenance window.

 

Posted By:  BCNET Operations Center

604-822-1348 option 3 noc@bc.net