UBC IT Network Maintenance – Pharmacy Data Centre Switch Upgrade April 28, 2019 21:00-23:59 PT

Update at 11:55PM –  The network maintenance is taking longer than expected, work will continue beyond the scheduled maintenance window up until approximately 1 AM.

 

UBC IT NMC will perform software upgrades on switches at the Pharmacy Data Centre – UBC Vancouver Campus on April 28, 2019 from 21:00-23:59 PT.

Clients with dual connections to the Pharmacy Data Centre switches will not be impacted during upgrades. Clients with single connections will experience an outage of up to 10 minutes while the switch reboots during the software upgrade.