As part of the campus switch upgrade program the backbone connectivity to the Brock Hall building will be increased from 1gig to 10gig on March 8th, 2011 at 5:30am.
The outage will last approximately 15-20 minutes. During this outage all network based communications into or out of the building will be interrupted.