MacMillan Building Scheduled Power (Network) Outage Sunday August 17, 2014 06:00 – 10:00 PT

As part of the Macmillan elevator refurbishing project, an aging and non-code compliant transformer cable that services the elevator will be replaced by Building Operations trades. In order to do this work, the electrical service to the building will be shut down on Sunday August 17th from 6:00 AM to 10:00 AM. This will result in the wired/wireless data / voice network being down for the duration of the outage.