L.S. Klinck Building Backup Generator Offline for Routine Maintenance on May 31st, 2006 between 7:00am and 11:00am

Plant Operations has scheduled a 3 to 4 hour offline period in order to change the oil in the L.S. Klinck backup generator. In case of a Hydro outage, IT systems have 20 to 30 minutes of UPS battery backup. No service outages are anticipated for this work.