Life Sciences B2514 Data & B2516 Server Rooms Electrical Load Check Mar 29, 2014 07:00-09:00 PT

As part of the Life Sciences Building Electrical Upgrade Project, Building Operations will be carrying out an electrical check of IT loads in the Basement Data and Server rooms. This will require two brief interruptions of power to these facilities however no service interruptions are expected as redundant battery backup power systems are in place.